Sync Sound combines local headphone playback with onward audio sharing, so two listeners can hear the same source without a physical splitter. We divided the design into power, wireless control, audio conversion and the user interface, then developed the hardware and software in parallel.
We developed a custom board and demonstrated wireless playback and sharing with a development-board setup. An STM32WBA63 revision using Bluetooth LE Audio is planned as the next implementation.
Protect The Power And USB Entry Point
Micro-USB provides a convenient charging input. I paired the connector with a TPD4E001 protection device and local bypass capacitance, keeping the external interface separate from the battery and regulated supply stages.
The schematic makes the protection path and connector pins visible before power moves into the charging circuit.
Manage A Rechargeable Battery
The charging design uses a BQ2409x single-cell lithium-ion charger, a current-setting resistor, a thermistor connection and charge-status indicators. A locally sourced 2,600 mAh 18650 cell supplied a practical battery option for the design.
We compared charger packages against electrical requirements, availability and ease of assembly, linking component sourcing and solderability to the power-system design.
Build A Two-Stage Supply
The TPS631000 buck-boost stage lets the design regulate across a changing battery voltage. Its inductor, feedback divider and capacitors establish the conversion stage; the downstream TLV77333 LDO was intended to provide the final 3.3 V rail and further attenuate supply ripple.
This separates efficient voltage conversion from final rail conditioning. The retained drawing sets the buck-boost near 3.3 V, so sufficient headroom for a regulated 3.3 V LDO output is a point to resolve in the next board revision.
Connect The Controller, Radio And User Inputs
The controller brings together wireless reception, audio buffering, playback and the two-button interface. The retained schematic shows how clocking, RF matching, status indicators and audio connections were brought around that central device.
An STM32WBA63 revision would retain these functional interfaces with a new pin map, clock/RF circuitry and firmware. Bluetooth LE Audio is the intended transport for that next implementation.
Plan The STM32WBA63 & Bluetooth LE Audio Revision
The proposed revision keeps separate power, controller and audio-codec stages while moving to STM32WBA63. Its LE Audio support and SAI peripheral provide the basis for the next wireless audio implementation.
The diagram below shows the intended interfaces, including LC3 processing and the codec connection. Audio-sharing roles, timing, buffer management and interoperability still need implementation and testing on the new hardware.
Convert The Digital Stream Into Headphone Audio
The custom board uses an NAU88C22 codec to separate digital processing from the analogue listening output. Serial audio enters the codec, while its left/right outputs connect through the output network to a headphone jack.
The device was selected for stereo conversion and room for later audio controls, including equalisation, mixing and level adjustment. Those additional features were design options rather than demonstrated functions of the prototype.
| Signal | Purpose |
|---|---|
| Bit clock | Times the transfer of individual serial audio bits. |
| Word select / frame clock | Identifies the channel or frame boundary. |
| Serial audio data | Carries the PCM sample stream to the codec. |
| Master clock, where required | Provides the codec timing reference for its configured clock mode. |
Make Playback And Sharing Testable
We separated stream reception, buffering, local playback and peer distribution so timing problems could be isolated. A laptop-side Python source and embedded C++ firmware provided a repeatable way to exercise the audio path.
The two-button interface kept the prototype’s operating modes simple. Buffer tuning exposed the central tradeoff: more queued audio can absorb interruptions, but it also adds delay.
| Input / Event | Starting Mode | Result |
|---|---|---|
| Power on | Off | Initialise the device in source-sharing / server mode. |
| Mode button | Source-sharing mode | Change to receiver / client mode. |
| Mode button | Receiver mode | Return to source-sharing mode. |
| Disconnect button | Either active mode | End the peer-sharing connection. |
These operating modes describe the tested prototype. Implementing the LE Audio state machine is part of the next revision.
Move From Schematics To A Physical Prototype
The design progressed through the complete schematic, PCB routing, a 3D board model, fabrication and component assembly. Development boards allowed software and audio testing to proceed while the custom hardware was being built.
Late assembly problems prevented a complete custom-board demonstration. We used the development setup with a PCM5102-family DAC module to demonstrate playback and redistribution, preserving a testable audio path while identifying the remaining hardware work.
| Check | Observation | Scope |
|---|---|---|
| Device-to-device delay | Approximately 0.5 seconds maximum | Development-board test setup. |
| Listening range | No noticeable quality change at 20 m or less | Qualitative listening observation. |
| Longer-range behaviour | Connection near 40 m, with substantial audio degradation | Range did not imply usable listening quality. |
| Portable operation | Full custom-board power performance was not established | Battery life and final-board performance require validation. |
These observations belong to the original demonstration and are not Bluetooth LE Audio performance results.
Select Parts And Build A Bill Of Materials
The candidate BOM pairs the proposed STM32WBA63 controller with the existing power and audio stages, using an estimated MCU unit price of $12.00 AUD.
The estimated component total is $69.73 AUD, including the controller. Supporting-circuit changes may affect the final cost.
| Item | Part / Allowance | Qty | Unit Price (AUD) | Line Total (AUD) |
|---|---|---|---|---|
| Audio jack | STX-3000 | 1 | $0.99 | $0.99 |
| MCU — proposed replacement | STM32WBA63 | 1 | $12.00 | $12.00 |
| LDO | TLV77333PDBVR | 1 | $0.16 | $0.16 |
| Antenna | 2450AT42B0100001E | 1 | $0.96 | $0.96 |
| Micro-USB connector | WM1399CT-ND | 1 | $1.47 | $1.47 |
| ESD protection | TPD4E001DBVR | 1 | $0.59 | $0.59 |
| Crystal oscillator | ECS-400-10-37B2-CKY-TR | 1 | $0.61 | $0.61 |
| Audio codec | NAU88C22YG | 1 | $1.95 | $1.95 |
| Battery charger | BQ24095DGQR | 1 | $1.78 | $1.78 |
| Battery | SB2308 | 1 | $16.95 | $16.95 |
| Buck-boost converter | TPS631000DRLR | 1 | $2.27 | $2.27 |
| PCB | Custom board | 1 | $20.00 | $20.00 |
| Resistors, capacitors & inductors | Combined allowance | 1 | $10.00 | $10.00 |
| Estimated BOM total | Including replacement MCU | — | — | $69.73 |
The STM32WBA63 price is approximately $12.00 AUD; other prices are historical estimates. MCU clock, RF and supply components need a compatibility review. The BOM specifies BQ24095DGQR; the charging circuit uses BQ24093DGQR.
Estimate The Development And Production Allowance
The business study spread development and production allowances across a 10,000-unit scenario, then added 20% overhead. This connects component selection with prototyping, mechanical work and certification costs.
The table retains the original scenario and recalculates its totals from the listed amounts. The wireless-certification allowance belongs to that original study; a Bluetooth LE Audio revision needs its own costing.
| Cost Area | Basis | Scenario Cost (AUD) | Per Unit (AUD) |
|---|---|---|---|
| Firmware / component allowance | $30.98-per-unit component allowance | $309,800.00 | $30.98 |
| Industrial / mechanical development | PCB and plastic enclosure allowance | $385,200.00 | $38.52 |
| Prototyping & testing | One iteration | $7,700.00 | $0.77 |
| Wireless certification allowance | Wi-Fi certification allowance for the prototype | $12,330.00 | $1.23 |
| CE certification allowance | Planning estimate | $98,610.00 | $9.86 |
| IEC certification allowance | Planning estimate | $2,800.00 | $0.28 |
| Labour | Assumed negligible in the model | $0.00 | $0.00 |
| Shipping | Assumed negligible in the model | $0.00 | $0.00 |
| Subtotal | Before overhead | $816,440.00 | $81.64 |
| Overhead | 20% of subtotal | $163,288.00 | $16.33 |
| Total planning allowance | 10,000-unit scenario | $979,728.00 | $97.97 |
The 10,000-unit scenario totals $816,440 before overhead and $979,728 after 20% overhead, equivalent to $97.97 per unit rounded.
Test The Commercial Scenario Over Five Years
The NPV model combines forecast production and sales with a $120 selling price, $97.97 cost per stocked unit and a 5% discount rate. It asks whether the assumed cash flows justify the scenario over five years.
Under these assumptions, the five-year net present value is $128,416.28 AUD. This is a planning scenario; actual sales and costs for the proposed STM32 revision remain unvalidated.
| Year | Stocked Units | Units Sold | Inflow (AUD) | Outflow (AUD) | Net Cash Flow (AUD) | Present Value (AUD) |
|---|---|---|---|---|---|---|
| Year 1 | 6,900 | 5,462 | $655,440.00 | $675,993.00 | $-20,553.00 | $-19,574.29 |
| Year 2 | 5,000 | 4,875 | $585,000.00 | $489,850.00 | $95,150.00 | $86,303.85 |
| Year 3 | 4,320 | 3,919 | $470,280.00 | $423,230.40 | $47,049.60 | $40,643.21 |
| Year 4 | 7,000 | 5,982 | $717,840.00 | $685,790.00 | $32,050.00 | $26,367.61 |
| Year 5 | 9,431 | 7,643 | $917,160.00 | $923,955.07 | $-6,795.07 | $-5,324.12 |
| Five-year NPV | — | — | — | — | — | $128,416.28 |
NPV uses unrounded discounted values; rows display two decimal places. Production outflow uses the rounded $97.97 unit-cost assumption.
PV(year) = (sales revenue − production outflow) / (1.05 ^ year)
Years are discounted at t = 1 through 5. The model includes no separate time-zero investment; its unit-cost allowance already spreads the development assumptions.
Plan For Technical And Delivery Risks
The risk assessment links design decisions to practical failure modes: incorrect pin connections, difficult soldering, battery issues, software faults, component delays and incomplete features. Each risk has a prevention measure and a fallback action.
The controls cover hardware assembly, software reliability and delivery. Planned software checks focus on buffering, playback continuity and recovery from faults.
| Risk | Likelihood | Impact | Severity | Mitigation | Contingency |
|---|---|---|---|---|---|
| PCB design errors | Low | High | High | Review schematics and pinouts; simulate analogue stages. | Revise the circuit and order replacement boards. |
| Small-component soldering damage | Low | High | High | Use stencils and experienced assembly guidance. | Choose easier-to-assemble packages and rebuild. |
| Battery failure or overcharge | Low | High | Medium | Check charging, supply ripple, protection and subsystem compatibility. | Replace affected battery/board using spares. |
| Software / audio-data failures | Medium | High | Medium | Stress-test buffering, playback continuity and control behaviour. | Return to a known-good audio path and isolate the fault. |
| Inaccurate cost estimates | Low | Medium | Medium | Compare component prices, availability and alternatives. | Replace costly parts or revise the architecture. |
| Incomplete core product features | Medium | Medium | Medium | Make core requirements testable and schedule them first. | Deliver the essential hardware/audio path before optional features. |
| Team illness | Medium | Low | Low | Build schedule margin and share task knowledge. | Redistribute work and communicate availability. |
| Slow component delivery | Medium | High | Low | Order 2–4 weeks ahead and check stock; keep alternatives. | Use available substitutes or development boards. |
| Overlapping task ownership | Low | Medium | Low | Agree responsibilities and hold regular progress reviews. | Reallocate work with mentor support. |
| Incomplete design documentation | High | Medium | Medium | Keep shared records; include documentation in completion criteria. | Reconstruct changes using agreed templates and test records. |
Ratings are qualitative planning assessments. Software stress tests are planned controls, not completed test results.
The Engineering Journey
Partition
Define the power, control and audio interfaces before selecting parts.
Prototype
Develop the custom board and software in parallel, keeping the audio path testable.
Evaluate
Connect observed performance, component costs and risks to the next design revision.
What This Experience Achieved
The result
A documented shared-audio design covering module schematics, custom-board development, playback and redistribution testing, component sourcing and a five-year commercial scenario, with an STM32WBA63 / LE Audio revision proposed.
Technical decisions & tools
The custom board uses an NAU88C22 codec. Playback and sharing were demonstrated using development boards and a PCM5102-family audio module.
The original controller/RF drawing is retained as prototype evidence. STM32WBA63 and Bluetooth LE Audio are the proposed next revision, with a concept diagram rather than an unverified replacement pinout.
Cost and NPV tables show the original commercial planning assumptions. The candidate BOM uses an estimated $12.00 AUD for the replacement MCU alongside historical component allowances.
Power-rail headroom, charger part-number consistency, clocking/RF details and final-board bring-up remain items to verify in a revised implementation.